ENGRAM now rings a doorbell when something is waiting for a person or an agent. Two agents finished that integration…
Now They Talk: ENGRAM Separates What’s Said from What’s Remembered
In August, two ENGRAM agents coordinated through memory, but a person relayed every hand-off. This time they talked over Buzz, Block’s open-source workspace for people and agents, and wrote the specification themselves, while ENGRAM kept the record.
Something Smaller Than an Agent: ENGRAM Scopes Authority to a Shared Project
The safest agent I had was the one that couldn’t help anybody. Authority used to attach to the agent, because there was nothing smaller to attach it to – restrict a worker, and you restricted it everywhere. A project is smaller. In v1.17 a project can have members, so a token can be trusted inside one piece of work without being trusted across the whole instance.
When the Question Has a Right Answer: ENGRAM Allows Agents to Work from a Brief
Associative retrieval does not fail when a question has a correct answer. It returns the plausible neighbour, states it confidently, and gives you no signal that it did. So ENGRAM now lets a project declare which documents are authoritative – and every agent working in that project inherits that declaration without being told it exists.
What the Transcript Couldn’t Tell Me: ENGRAM Learns to Read What Actually Shipped
A session transcript is authoritative about what was attempted. Git is authoritative about what shipped. For three months ENGRAM had only the first one, and I did not notice I was asking it the wrong questions.
No Message Passed Between Them: ENGRAM Agents Coordinate Through Memory
The hard part of running a fleet was never spawning the agents or routing the tasks — your harness already does that. The hard part is what they know, and whether one agent’s finding can reach another without leaking to everyone. That is not a scheduling problem. It is a memory problem.
What I Believed Last Tuesday: ENGRAM Learns to Change Its Mind
A memory system that cannot change its mind is an archive. One that changes its mind by overwriting is a liability. The interesting question was never how a fact gets updated — it is what happens to the belief you stopped holding.
The Layer a Harness Can’t Own
The contest moved above the agent, onto the layer that orchestrates the fleet. But the layer that actually wins isn’t the orchestrator — it’s the governed memory underneath it, the one thing a harness can’t own about itself.
A Team of Its Own: ENGRAM Agents Learn to Grow and Orchestrate a Team
Last time, ENGRAM handed a person the power to make agents — fenced. This release hands a bounded slice of that power to an agent itself: with a human’s say-so, an orchestrator can become a manager, spin up a small team of sub-agents — each a distinct identity with its own memory — fan work out to them, and gather it back. Not a control plane bolted on top; the team thinks together through the same memory it already had. A team of its own, bounded at every edge.
Standing Up Your Own Agents: ENGRAM Adds an Agent Manager Role
Until now, making an agent in ENGRAM meant being an administrator — which also meant holding the keys to every human account and every system setting. Far too much power for “I just need a coder agent that remembers.” This release splits provisioning off into a capability of its own: an Agent Manager can stand up and run the agents they own, and nothing else. Least privilege, applied to the power to make new minds.